Cloud Migration in Rwanda
Moving servers, storage or applications to the cloud with a plan for the cutover, not just the copy.
Cloud migration moves servers, file shares and applications from your premises into the cloud, with each workload assessed first, moved by the right method, tested, and switched over with a rollback plan. Any organisation with ageing servers, a team working across sites or a server room it would rather not maintain should consider it. This page covers the migration project itself. Deciding at a strategic level what your cloud direction should be, independent of any supplier, is covered by cloud strategy under IT Consultancy.
What is cloud migration, and who needs it
It’s a planned project to move specific workloads, such as a file server, a line-of-business application, a database or a website, from local hardware to cloud services, usually Microsoft Azure or Microsoft 365. It suits organisations facing a server replacement, a lease or support renewal, rapid growth, a move to multiple sites, or recurring problems with power and cooling in the server room.
The problem it solves
A migration treated as a simple copy usually fails at the cutover. Applications depend on fixed network paths, file permissions don’t translate, data changes during the copy, and a slow internet link turns a fast local system into a frustrating remote one. Planning each workload, testing it in the cloud before switching and keeping a rollback path turns migration from a risky weekend into a controlled change.
Choosing how each workload moves
Rehost (lift and shift). The server is moved largely as it is to a cloud virtual machine. Fast, but carries existing problems along, and costs can be higher than expected.
Replatform. The workload moves to a managed cloud service, such as file shares to SharePoint or a database to a managed database service, removing server maintenance.
Replace. An old application is retired in favour of a cloud product that does the same job.
Retain. The workload stays on site, because it works better there or isn’t worth moving yet.
Each choice is made per workload, weighing cost, effort, risk and how well it will perform over your internet connection.
Data location and cost
The nearest Azure regions to Rwanda are in South Africa, so moving personal data to Azure stores it outside the country. Rwanda’s Law N° 058/2021 requires storage in Rwanda unless the National Cyber Security Authority’s registration certificate permits otherwise, so this belongs in the migration plan, with your legal adviser. Cost changes too: one-off server purchases become a monthly bill, so we estimate running costs per workload before you commit, and plan ongoing cost management after go-live.
What the work involves
- Inventory servers, applications, data volumes, dependencies and who uses what.
- Assess each workload: move method, estimated monthly cost, connectivity needs and data location.
- Prepare the cloud environment: subscriptions, network, identity, security and backup.
- Migrate and test each workload, with users checking it before cutover.
- Cut over in agreed windows, with the old system kept for rollback.
- Decommission the old system after sign-off, and wipe its data.
What’s included and what’s not
Included: workload assessment, migration planning, cloud environment setup, data migration and verification, and cutover.
Not included unless bundled: ongoing management after go-live (see cloud infrastructure management), application redesign where a workload needs rewriting (see Software Development) and additional internet links, which we can specify but you contract with a provider.
Typical timelines and what drives cost
A single server or file share typically takes one to three weeks including planning, testing and cutover. Larger estates are moved in waves over several months. Cost is driven by the number of workloads, data volume over your available bandwidth, application complexity and vendor support, and how much testing users need.
Equipment typically used
Azure Migrate for assessment and server moves, the SharePoint Migration Tool for file shares, database migration tools where needed, Azure Backup, and a VPN or dedicated connection between your office and Azure for hybrid setups. Reliable internet with failover at each site.
Common mistakes we see
Moving servers as they are and finding the cloud bill higher than the old hardware. No test of application speed over the real internet connection. Hidden dependencies, such as a scanner or accounting add-in, discovered on cutover day. Old servers switched off before users confirmed everything works. No backup configured in the cloud. And data location never considered.
Microsoft & Cloud
Related services
-
Cloud Infrastructure Management
Ongoing management of cloud resources so cost and performance don’t drift unmonitored.
-
User Device Management
Centralised policy, patching and security across every managed laptop and desktop.
-
Email Collaboration
Exchange Online, Teams and SharePoint set up so email and collaboration actually work together.
Insights
Related reading
-
, 4 min read
Cloud Migration: How Long It Actually Takes
Cloud migration timeline depends mainly on application complexity and the migration approach chosen — here's a realistic breakdown.
-
, 4 min read
How Much Does Cloud Migration Cost in Rwanda?
Cloud migration cost depends on data volume, application complexity, and the migration approach chosen — here's what drives the number.
Frequently asked questions
Should everything move to the cloud, or does some infrastructure make more sense staying on-site?
Not everything should move. Email, file sharing and many business applications suit the cloud well. Systems that need fast local access to very large files, equipment that must keep working when the internet is down, or applications whose licence or vendor doesn't support cloud hosting may be better on site. We assess each workload separately and often recommend a hybrid result.
What happens to our data during migration — is there a risk of loss?
The risk is managed by never deleting the original until the copy is proven. Data is copied, then checked by counts, sizes and test use, and the old system stays intact and available for rollback until you've signed off. Backups of both environments are confirmed before cutover. Loss usually happens when old systems are switched off too early.
How much does internet reliability matter for cloud-hosted workloads?
A great deal. Once a system runs in the cloud, staff can only use it while the office is online. For anything critical, we recommend two internet links from different providers with automatic failover, and we test the application's speed over your real connection before migrating. Where connectivity can't be made reliable enough, the workload stays local.
Can migration happen without downtime?
Almost, for most systems. Data is copied in the background while the old system keeps running, and only a final sync and switch-over need a short pause, scheduled outside working hours. Some older applications need a longer window. The acceptable downtime for each system is agreed in advance, and we plan the method to fit it.
What happens to the old infrastructure after migration?
It's kept, powered off or read-only, for an agreed period, usually a few weeks, as a fallback. Then its data is securely wiped, and the hardware is either repurposed, for example as a backup target, or retired responsibly. Licences tied to the old servers are reviewed so you don't keep paying support on equipment you no longer use.